Installation
The line start up is always done by Rama technicians.
The customer usually proceed with two different acceptance tests:
• PDI (Pre Delivery Inspection), directly at Rama and before delivery;
• SAT(Specification Acceptance Test) at buyers’ site together
with the customer’s technicians.
These tests have the purpose to guarantee
the maximum machines functionality, assuring “time saving” and
minimize the risks.